The Supreme Quality mobile battery offers an accurate 100% health indication without pop-up windows and without the use of glue. Ideal for replacing an old battery, the installation process includes the following steps:
- Removal of the BMS Flex cable from the old original battery.
- Connecting the old BMS cable to the new battery and connecting the connectors.
- Properly folding the BMS with adhesives for stability.
- Connecting the battery to the phone and powering it with a charger if required.
- 100% battery indication in the settings after installation confirms success.
- Restarting to confirm the battery health without messages about non-genuine parts.