APPLICATION OF ROAD PAINT
To ensure proper adhesion of the paint, the surface to be painted must be cleaned of dust, grease, oils, peeling old paints, rust, remnants of mold, or moisture. We apply the product (after thoroughly mixing it). The product gains all its mechanical resistances after 20 - 30 days.
APPLICATION CONDITIONS
Avoid applying the product at temperatures below 6°C and above 40°C, and when the relative humidity is higher than 80%. Adverse conditions during application can alter the final properties of the paint.
APPLICATION TOOLS
- Brush
- Roller
During the work, keep the tools “wet” inside the container or bucket with the paint. Drain the paint well from the tools back into the box and clean immediately with thinner. If the paint dries, it can only be removed with strong detergents. Do not dispose of wash liquids into the groundwater.
Coverage: 2.5-3m2/kg
Dilution: 5 - 10% solvent thinner
Drying: 10 - 20 minutes depending on application conditions
Specifications
- Type
- Road Marking Paint
- Colour
- White
- Acrilyc
- No
Quantity
- Weight
- 1 kg
Important information
Specifications are collected from official manufacturer websites. Please verify the specifications before proceeding with your final purchase. If you notice any problem you can report it here.