- Shake well before use.
- The application surface must be flat, dry, and free of dust, grease, and loose materials.
- For floors, ensure they are not subject to rising moisture.
- For cement screeds, the concrete quality must be at least C20/25, with a cement content of 350kg/m3, moisture <4%, and the application should be carried out at least 30 days after the surface construction.
- A suitable "mold" should be provided around the perimeter of the application surface to contain the resin.
- It is important to stir well on the walls and bottom of the container to achieve proper homogenization.
- Let the mixture sit for another 2-3 minutes and then proceed with the application by pouring it from a low height onto the surface.
- Prefer thicknesses up to 5 mm to allow any bubbles that have formed to rise.
- If bubbles have formed immediately after application, break them with a hot air device or torch.
- The surface should not come into contact with moisture for at least 6-8 hours.
- Light foot traffic after 24-36 hours and normal traffic after 72 hours. Final curing in 7 days.
Sign up in one tap with Google, Apple or Facebook